| Project Name | Changshu Zeus bar | Project Introduction | There are four sky curtains and two long screens on the left and right sides. |
|---|---|---|---|
| Project Date | 2021.04 | Equipment used | LS16,G612*80 |
| Project Location | Changshu City, Jiangsu Province | Project Requirements | 1. The whole picture is displayed on the left and right sides of the sky curtain; 2. Computer direct transmission, point-to-point, the overall display screen is smooth without jamming. |
View all cases
-
Spherical screen of a screen factory in Shenzhen
Project Name:Spherical screen of a screen factory in Shenzhen
Project Date:2020.09
Project Location:Shenzhen
Project Introduction:The hemispherical screen is composed of three modules. There are two trapezoidal modules below, one circular module above, and one circular module is composed of four sector modules.
-
Sichuan Yanting Live House
Project Name:Sichuan Yanting Live House
Project Date:2022.05
Project Location:Yanting City, Sichuan Province
Project Introduction:1. One main screen on the front, 1DJ platform 2. Skyscreen square layout 3. Square screen around.
-
A bar in Chengdu, Sichuan
Project Name:A bar in Chengdu, Sichuan
Project Date:2020.11
Project Location:Chengdu
Project Introduction:1 x screen, 3 column screens, 4 ceiling screens and 4 perimeter strip screens
-
Shenling ring, Foshan, Guangdong
Project Name:Shenling ring, Foshan, Guangdong
Project Date:2022.04
Project Location:Foshan, Guangdong
Project Introduction:1. Three trapezoidal modules; 2. Load with sv8p + g616c; 3. One box and one card
-
Datang network exhibition hall
Project Name:Datang network exhibition hall
Project Date:2020.12
Project Location:Jinan City, Shandong Province
Project Introduction:Special shaped triangular module, three sides of the whole screen.
-
V + CLUB bar in DeZhou
Project Name:V + CLUB bar in DeZhou
Project Date:2020.07
Project Location:DeZhou
Project Introduction:There are multiple screens in the bar, indoor P4 module, home screen pixel point 3328*2048, side screen pixel point 512*1920, DJ table pixel point 2240*256, ceiling screen 33 groups of 200*240 boxes and six groups of ring screen.
-
Circular screen of industrial and Commercial Bank of China
Project Name:Circular screen of industrial and Commercial Bank of China
Project Date:2021.03
Project Location:Beijing
Project Introduction: Special-shaped splicing
-
Ordos Kangbashi sweat factory bar
Project Name:Ordos Kangbashi sweat factory bar
Project Date:2020.11
Project Location:erdos
Project Introduction:Point to point display and unified broadcast control
-
Changshu Zeus bar
Project Name:Changshu Zeus bar
Project Date:2021.04
Project Location:Changshu City, Jiangsu Province
Project Introduction:There are four sky curtains and two long screens on the left and right sides.