| Project Name | Nanshan museum | Project Introduction | P3 project, tree project, whole screen number 1216*1728 |
|---|---|---|---|
| Project Date | 2018.06 | Equipment used | KS928 |
| Project Location | Shenzhen | Project Requirements |
View all cases
-
Xigaze tide card plus
Project Name:Xigaze tide card plus
Project Date:2020.09
Project Location:Xigaze, Tibet
Project Introduction:1. There is a main screen on the front and a DJ console on both sides of the main screen The top surface is an annular screen composed of 8 arcs, and both the inner and outer arcs have screens; There is also a spherical screen in the middle of the sky cur
-
Spherical screen of a screen factory in Shenzhen
Project Name:Spherical screen of a screen factory in Shenzhen
Project Date:2020.09
Project Location:Shenzhen
Project Introduction:The hemispherical screen is composed of three modules. There are two trapezoidal modules below, one circular module above, and one circular module is composed of four sector modules.
-
Chongqing West Railway Station - Chongqing eye City Exhibition Hall
Project Name:Chongqing West Railway Station - Chongqing eye City Exhibition Hall
Project Date:2022.01
Project Location:Chongqing
Project Introduction:1.4 projectors 2 A curved front uses two projectors 3 Two projectors for one ground 4 Projection fusion display complete picture 5 Central control light, LCD screen, projection
-
Ordos Kangbashi sweat factory bar
Project Name:Ordos Kangbashi sweat factory bar
Project Date:2020.11
Project Location:erdos
Project Introduction:Point to point display and unified broadcast control
-
Guizhou Xingyihua Music Bar
Project Name:Guizhou Xingyihua Music Bar
Project Date:2022.07
Project Location:Xingyi City, Guizhou Province
Project Introduction:Bar screen is divided into main screen, sky screen, side screen, strip screen and outdoor strip screen.
-
Penglai Space bar
Project Name:Penglai Space bar
Project Date:2020.01
Project Location:Penglai
Project Introduction:Various different screens display 2, P4 modules independently, high refresh, do rotation, with HUB port offset.
-
Shenyang wedding hotel
Project Name:Shenyang wedding hotel
Project Date:2020.01
Project Location:Shenyang
Project Introduction:Four pillar screens, four side screens, one awning
-
Beijing banana ring KTV phase II
Project Name:Beijing banana ring KTV phase II
Project Date:2021.06
Project Location:Beijing
Project Introduction:1. Each room has a ceiling screen, round or rectangular 2 There will be irregular shaped screens on some walls of the room.
-
Guizhou Xishui Junpin international KTV tree screen
Project Name:Guizhou Xishui Junpin international KTV tree screen
Project Date:2021.06
Project Location:Zunyi City, Guizhou Province
Project Introduction:Indoor P4 soft module to assemble a tree screen