| Project Name | A bar in Zunyi | Project Introduction | Control all LED screens with effects on the Resolume software |
|---|---|---|---|
| Project Date | 2020.07 | Equipment used | LS6×1,LS4PRO×2,LS4×2,LS2×4,G612 |
| Project Location | Zunyi | Project Requirements | Control all LED screens with effects on the Resolume software |
View all cases
-
Magic cube screen, Vientiane City, Shantou City, Guangdong Province
Project Name:Magic cube screen, Vientiane City, Shantou City, Guangdong Province
Project Date:2021.09
Project Location:Shantou City, Guangdong Province
Project Introduction:The project site uses 85 sets of 5 large magic cube screens + 55 sets of 5 small magic cube screens, with a total of 140 ceiling magic cube screens.
-
Hebei Cangzhou Nanpi radio and television station
Project Name:Hebei Cangzhou Nanpi radio and television station
Project Date:2021.12
Project Location:Cangzhou City, Hebei Province
Project Introduction:A total of 22 screens to achieve full point-to-point display
-
Sichuan Yuechi Bar
Project Name:Sichuan Yuechi Bar
Project Date:2022.07
Project Location:Yuechi County, Sichuan Province
Project Introduction:1. Two secondary screens on the side, with a DJ table. 2. Circular distribution on the top
-
Hebei Shijiazhuang lerentang Pharmaceutical Co., Ltd
Project Name:Hebei Shijiazhuang lerentang Pharmaceutical Co., Ltd
Project Date:2021.01
Project Location:Shijiazhuang, Hebei
Project Introduction:1.G612C × 40 2. Full screen 14080 × 256 3. T1 discount point-to-point loaded P4 module
-
Penglai Space bar
Project Name:Penglai Space bar
Project Date:2020.01
Project Location:Penglai
Project Introduction:Various different screens display 2, P4 modules independently, high refresh, do rotation, with HUB port offset.
-
Shougang international qinhuangdao logistics base
Project Name:Shougang international qinhuangdao logistics base
Project Date:1970.01
Project Location:Qinhuangdao
Project Introduction:Full screen 22 transparent screen, need full screen display screen, shooting effect is good.
-
Shenyang wedding hotel
Project Name:Shenyang wedding hotel
Project Date:2020.01
Project Location:Shenyang
Project Introduction:Four pillar screens, four side screens, one awning
-
V + CLUB bar in DeZhou
Project Name:V + CLUB bar in DeZhou
Project Date:2020.07
Project Location:DeZhou
Project Introduction:There are multiple screens in the bar, indoor P4 module, home screen pixel point 3328*2048, side screen pixel point 512*1920, DJ table pixel point 2240*256, ceiling screen 33 groups of 200*240 boxes and six groups of ring screen.
-
Shenyang wedding hotel
Project Name:Shenyang wedding hotel
Project Date:2020.01
Project Location:Shenyang
Project Introduction:Nine door screens and one canopy