| Project Name | Shangjin ancient city, Shiyan, Hubei | Project Introduction | 550 ㎡ tunnel screen with a resolution of 20864 * 2944 |
|---|---|---|---|
| Project Date | 2021.07 | Equipment used | Kommander F2、KS9800、S4*28、S2*4、G612C*652 |
| Project Location | Shiyan City, Hubei Province | Project Requirements | The project creates an immersive tunnel corridor in the ancient city of Shangjin, which is spliced by P3 modules. Ks9800 splicer and Kommander F2 server are used to control the screen of up to 550 m2. The whole large screen material is perfectly connected |
View all cases
-
Beijing maker town
Project Name:Beijing maker town
Project Date:2022.04
Project Location:Beijing
Project Introduction:1. A large main screen on the front
-
Shanghai Baoshan hotel lobby
Project Name:Shanghai Baoshan hotel lobby
Project Date:2021.08
Project Location:Baoshan District, Shanghai
Project Introduction:Thirty four rhombic screens are arranged in two rows, one with 17 rhombic screens
-
Bright investment wisdom City some exhibition center
Project Name:Bright investment wisdom City some exhibition center
Project Date:2020.07
Project Location:ShenZhen
Project Introduction:LED screen 1 L type 1536* 2432,12 LCD, 1 projection, 2 audio, HDMI to SDI converter
-
Hangzhou a unit exhibition hall
Project Name:Hangzhou a unit exhibition hall
Project Date:2020.01
Project Location:Hangzhou
Project Introduction:Skyscreen strip screen, display custom material, set off the environment display
-
Shenzhen Nanshan site Beiyou Technology Building
Project Name:Shenzhen Nanshan site Beiyou Technology Building
Project Date:2021.08
Project Location:Shenzhen City, Guangdong Province
Project Introduction:P2 - five sided immersion design, five sided tunnel display combined with conventional version and special-shaped plate.
-
Exhibition Hall of Jingyu Industry Co., Ltd
Project Name:Exhibition Hall of Jingyu Industry Co., Ltd
Project Date:2022.07
Project Location:Shanghai
Project Introduction:1.5 conventional LED screens 2.1 three side immersion 3.1 LCD screens 4.2 column screens
-
Hebei Tangshan Qian'an Tangshan special steel
Project Name:Hebei Tangshan Qian'an Tangshan special steel
Project Date:2021.08
Project Location:Tangshan City, Hebei Province
Project Introduction:The large 4K curved screen in the exhibition hall of Qian'an Tangshan special steel enterprise uses ks9800 video processor. Ks9800 video processor supports kystar frame synchronization (KFS) technology, which can ensure the complete frame synchronization
-
Hebei publishing media group
Project Name:Hebei publishing media group
Project Date:2022.04
Project Location:Shijiazhuang, Hebei
Project Introduction:1. Point spacing 1.53 module, left screen 5408*1872, main screen 14144*1560, floor tile screen 3226*1176, long screen 5504*334, right LCD 6*3. Two sets of F2 are used for cascade control to realize the unified management of all screens.
-
Heze Ski Resort
Project Name:Heze Ski Resort
Project Date:2020.09
Project Location:Heze City, Shandong Province
Project Introduction:Tunnel screen, module p3-2038s, tunnel screen is 5696x2816 long, and another half of the round screen is the top of the tunnel.