| Project Name | Zhangjiagang Sinosoft group headquarters exhibition hall | Project Introduction | 1. The resolution of the main screen of the front door is 5760 * 2560, and the resolution of the two column screens are 3840 * 2160 respectively; 2. There are 8 P2 displays in the inner hall, with resolutions of 2 1760 * 1280, 3 2240 * 1280, 2 2400 * 1280 |
|---|---|---|---|
| Project Date | 2021.05 | Equipment used | Kommander F2*3,KS9800*2,Kapollo *3 |
| Project Location | Zhangjiagang City, Jiangsu Province | Project Requirements | 1. Screens of different specifications can be centrally controlled and managed by cloud control 2. Multiple videos or pictures can be played circularly 3. Ensure the display effect, and all screens are displayed point-to-point. 4. The power supply need |
View all cases
-
Zhangjiagang Sinosoft group headquarters exhibition hall
Project Name:Zhangjiagang Sinosoft group headquarters exhibition hall
Project Date:2021.05
Project Location:Zhangjiagang City, Jiangsu Province
Project Introduction:1. The resolution of the main screen of the front door is 5760 * 2560, and the resolution of the two column screens are 3840 * 2160 respectively; 2. There are 8 P2 displays in the inner hall, with resolutions of 2 1760 * 1280, 3 2240 * 1280, 2 2400 * 1280
-
An exhibition hall in mumbai, India
Project Name:An exhibition hall in mumbai, India
Project Date:2020.01
Project Location:Mumbai, India
Project Introduction:11 LCD screens are irregularly spliced
-
Hangzhou 5G exhibition hall
Project Name:Hangzhou 5G exhibition hall
Project Date:2020.01
Project Location:Hangzhou
Project Introduction:The screen is a movable telescopic screen
-
Zhejiang Shengqi technology exhibition hall Co., Ltd
Project Name:Zhejiang Shengqi technology exhibition hall Co., Ltd
Project Date:2021.08
Project Location:Hangzhou City, Zhejiang Province
Project Introduction:Four displays of different sizes
-
Haier group international exhibition hall
Project Name:Haier group international exhibition hall
Project Date:2018.09
Project Location:Shandong
Project Introduction:Two servers have unified control over 20 screens to achieve complete point-to-point display. One plays 16 videos at the same time, while the other plays 9 videos at the same time.
-
Shangyu HP Plaza exhibition hall
Project Name:Shangyu HP Plaza exhibition hall
Project Date:2021.01
Project Location:Shangyu City, Zhejiang Province
Project Introduction:Immersive display with four screens
-
Beijing army aviation academy
Project Name:Beijing army aviation academy
Project Date:2020.01
Project Location:Beijing
Project Introduction:P3,4608×832
-
Jurong Wuyue Plaza KTV
Project Name:Jurong Wuyue Plaza KTV
Project Date:2020.09
Project Location:Jurong City, Jiangsu Province
Project Introduction:1. A door frame screen on the front covers the whole door frame. 2. There is a small screen on the left and right of the door channel.
-
Gansu Baiyin cultural and creative center
Project Name:Gansu Baiyin cultural and creative center
Project Date:2020.12
Project Location:Baiyin City, Gansu Province
Project Introduction:1. 12 column screens and one sky screen; 2. One tunnel screen; 3. A three fold display strip screen.