| Project Name | The fourth people's hospital of guizhou | Project Introduction | P2.5,3200x1152 |
|---|---|---|---|
| Project Date | 2020.01 | Equipment used | G612,SV6 |
| Project Location | Guizhou | Project Requirements | Display dual screen signal |
View all cases
-
Sand table of Xiangxi high tech Zone
Project Name:Sand table of Xiangxi high tech Zone
Project Date:2021.04
Project Location:Xiangxi City, Hunan Province
Project Introduction:1. The whole screen is 8320 * 1024, and one sv16 is loaded
-
Jilin University Town studio
Project Name:Jilin University Town studio
Project Date:2021.12
Project Location:Jilin City, Jilin Province
Project Introduction:Side screen 1280 × 2048 two, main screen 5440 × 2048, total resolution 8000 × 2048.
-
China military museum
Project Name:China military museum
Project Date:2020.01
Project Location:Beijing
Project Introduction:Four cylinder screens, divided into two large cylinders and two small cylinders
-
Hebei Gaobeidian Shanhe formation mould center
Project Name:Hebei Gaobeidian Shanhe formation mould center
Project Date:2020.09
Project Location:Hebei
Project Introduction:Full screen 3200 ✖ 3968, high tech P2 5。 One sv16 + T1 to realize complete point-to-point display.
-
Hebei Tangshan Qian'an Tangshan special steel
Project Name:Hebei Tangshan Qian'an Tangshan special steel
Project Date:2021.08
Project Location:Tangshan City, Hebei Province
Project Introduction:The large 4K curved screen in the exhibition hall of Qian'an Tangshan special steel enterprise uses ks9800 video processor. Ks9800 video processor supports kystar frame synchronization (KFS) technology, which can ensure the complete frame synchronization
-
Jurong Wuyue Plaza KTV
Project Name:Jurong Wuyue Plaza KTV
Project Date:2020.09
Project Location:Jurong City, Jiangsu Province
Project Introduction:1. A door frame screen on the front covers the whole door frame. 2. There is a small screen on the left and right of the door channel.
-
Memorial Hall of the Fourth National Congress of the Communist Party of China
Project Name:Memorial Hall of the Fourth National Congress of the Communist Party of China
Project Date:2021.05
Project Location:Shanghai
Project Introduction:1. Two screens are used in the project, and specific materials are played point-to-point, clear and undamaged. The Cassida control system ensures the perfect effect of the exhibition hall.
-
Henan Luoyang science and Technology Museum
Project Name:Henan Luoyang science and Technology Museum
Project Date:2021.04
Project Location:Luoyang, Henan
Project Introduction:Science and technology exhibition hall in the museum, P2 5-icnd2038s-5958, special-shaped plate and conventional version
-
Tianjin Ninghe Citizen Square Exhibition Hall
Project Name:Tianjin Ninghe Citizen Square Exhibition Hall
Project Date:2022.07
Project Location:Ninghe District, Tianjin
Project Introduction:1. Two U-shaped strip screens on the front 2. One interactive ground screen